The great work we did
- Client: Vital Laboratories Pvt. Ltd.
- Status: Completed
- P.O. Value in CR: 0.05
MCC Panel Lifting & Different Sites
AMI Electricals successfully completed MCC Panel lifting, shifting and installation work at multiple industrial locations for Vital Laboratories Pvt. Ltd. The project involved safe handling and relocation of critical electrical equipment while minimizing production downtime.
Our scope included dismantling existing MCC panels, transportation, foundation preparation, panel erection, cable termination, alignment, testing and commissioning. Every stage of the project was performed using proper lifting equipment and in accordance with industrial safety procedures.
After installation, comprehensive testing and inspection ensured reliable operation and electrical safety. The successful execution of the project enabled uninterrupted plant operations with enhanced system reliability.